Moss Plastic Parts Ltd | Multi-Tier Shelving System Project​

 Click here to download the Moss Plastic Parts Ltd PDF case study

Project Brief

 

Multitier shelving system designed in line with warehouse extension, complete with passenger goods lift

 

Key Features

 

Feasibility & designs carried out liaising with architect & builder prior to planning application submission for extension

 

Maximisation of space available within the extension

 

Leg loading information provided for warehouse floor specification

 

Advice & guidance on building regulation approval

 

Four level multitier rack supported picking structure for 1000's of product lines

 

8,000kg bay loading with mesh decking

 

Goods & pedestrian lift for efficient picking process with 1,125kg capacity

 

Two multitier mezzanine floor staircases abutting walkways for access & fire safety

 

Fire prevention system including heat & smoke detectors plus in-rack sprinkler system, & 60 minute fire rating

 

Energy efficient 250 lux T5 light fittings on PIR sensors

 

Anti-collapse mesh & high tencity Polypropylene rack netting for pedestrian safety

 

Design, installation & project management

Client:

Moss Plastic Parts Ltd


Location:

Kidlington, Oxfordshire


 

 

Multi-tier shelving systems with mesh decking

"The whole project has gone extremely well and has been delivered on cost and on time. SEC worked closely with Moss, ensuring the design maximised the available storage cube and continuing operations were maintained throughout the installation period."

 

Maurice Callan

Operations Director

Multi-tier shelving system Moss Plastic Parts Oxofrdshire
Oxfordshire Multi-tier shelving system for Moss Plastic Parts

Before you go...take a look at some of our other storage projects