Maxinutrition (GlaxoSmithKline UK Ltd) - Warehouse Reconfiguration for Forklift Use‚Äč

Project Brief

 

Warehouse Reconfiguration of existing installation to articulated fork lift truck operation to provide increased storage capacity

 

Key Features

 

Free of charge warehouse appraisal of existing wide aisle reach truck operation & development of space plan options for different storage systems

 

Options included dense storage, very narrow aisle (VNA) & articulated fork lift truck operation

 

Articulated solution suited operational requirements over traditional VNA; lower capital expenditure but same capitalization of space

 

Utilisation of existing materials & supply of new pallet racking plus barrier protection, timber decking & back of rack anti-collapse netting

 

Installation of mezzanine floor to provide additional footprint for pick & pack operation with pallet gate

 

Electrical installation to underside of mezzanine floor including lighting & small power

 

Project management throughout including CDM, Building Regulations application & approval plus onsite installation, with continued client operation throughout

Client:

Maxinutrition (GlaxoSmithKline UK Ltd)


Location:

Hemel Hempstead, Hertfordshire


Contract Duration:

'8' weeks

 

"When we first thought about this project, we called SEC and they came up with ideas and provided us several drawings of what was possible. They made the whole process simple. When the work started their team of installers were an absolute treat to deal with. Despite taking down the entire racking system and installing it again with additional racking, we never lost a single day trading"

 