Expert Installations Ltd - Mezzanine Floor & Pallet Racking Project​

Click here to download the Expert Installations Ltd PDF case study

Project Brief

New mezzanine floor and pallet racking installation optimises storage capacity whilst allowing for the creation of additional office space at Expert Installations Luton head office and warehouse...

 

Client Background

Expert Installations are specialists in the distribution, installation and maintenance of retail displays and POS throughout the UK, Ireland and Europe.

Client:

Expert Installations Ltd
 

Location:

Luton, Bedfordshire
 

Project Summary:

Installation of a new mezzanine office floor and pallet racking installation at Expert Installations Luton head office and warehouse...

Office mezzanine floor and warehouse fit out Expert Installations Ltd.
Warehouse fit out Expert Installations Ltd.

"SEC provided me with a one stop solution for racking, mezzanine and office extension which meant that I had one point of contact for the whole project. All work was completed on time and to a high standard."

 

James Hogston

Managing Director

Adjustable pallet racking installation
Office mezzanine floor installation

A fully integrated solution: Office mezzanine floor and warehouse fit-out

 

Expert Installations were in the process of moving to a larger facility having outgrown their existing premises, and so enlisted SEC to design, supply and install a joint storage and interiors solution that would both maximise warehouse capacity and create additional office space.

 

A mezzanine floor was the primary solution for maximising area; to do this, SEC looked to make holes in the existing plasterboard office ceiling to facilitate the installation of the proposed mezzanine floor. Once the floor and column casings were installed, SEC then re-instated the plasterboard ceilings - taping, jointing and then repainting the whole of the office and kitchen areas to make good.

 

Stud partitioning was then used to seperate and create a new meeting room area and private office space below. HVAC systems and lighting were also installed along with suspended ceilings throughout the new office space.

 

Carpet tiles were supplied and flooring layed throughout the new areas, whilst the existing single door and adjacent window was removed to make way for new oak veneer double doors. Out on the warehouse floor, SEC looked to install multiple bays of pallet racking, configured to varying heights dependent on the allowance of vertical space in key areas of the warehouse.

 

A new pallet gate loading system was also positioned atop the mezzanine floor, with both solutions optimising loading and storage capabilities throughout.

Do you need a similar solution? Get in touch. We always aim to respond within 1 hour