Essentra

Essentra plc | Very Narrow Aisle Racking & Mezzanine Installation

Click here to download the Essentra plc - Kidlington PDF case study

Project Brief

Very Narrow Aisle Racking installation (VNA) with three tier picking tower, mesh decks with dividers, multi-floor mezzanine structure with lift access and installation of building and lighting controls...

 

Client Background

As the origins of Essentra Components - Moss Plastics, based in the UK, manufactures and distributes a broad range of injection and dip moulded components serving a wide range of industries.

 

With local offices and distribution centres across Europe, the company was well placed to meet the challenging delivery requirements of its European-wide customers thanks to the efficient and effective design and installation work from SEC.

Client:

Essentra plc


Location:

Kidlington, Oxfordshire


Project Summary:

VNA pallet racking installation & multi-tier rack supported picking structure with mezzanine floor...

VNA - very narrow aisle pallet racking
Pallet racking with tote box storage

"The whole project has gone extremely well and has been delivered on cost and on time. SEC worked closely with Moss, ensuring the design maximised the available storage cube and continuing operations were maintained throughout the installation period."


Maurice Callan 

Operations Director

Racking mesh panel protector
Warehouse fit out

Approach

 

Essentra, a previous client of the SEC Group had just moved into a brand new building and needed a multi-feature installation for their new 24/7 warehouse and distribution facilities in Kidlington, Oxfordshire.

 

Firstly a design and feasibility study took place and out of that SEC found that a three tiered mezzanine floor and staircase system could be installed with great effect.

 

Lift access was also built in throughout the floors, and a picking tower was also implemented to optimise warehouse maneuverability with the pallet racking installation also featuring mesh decks and dividers. Lighting and building control features in the warehouse were also built in.

 

Through continous correspondence with Essentra in working out the finer details of the design, supply and installation process, SEC managed to develop and implement a multi feature installation that has helped to maintain the operational efficiency that Essentra needs for their new 24/7 run facility.