SEC Interiors working in partnership with VolkerFitzpatrick Ltd

Higher Education  Institute:
Science Building

Project Brief

The fit-out of a prestigious, Cambridge based Higher Education Institutes: Science Building, including staff office facilities...

 

Take a look at our other works involved in Phase 1, which included the creation of a cellurarised, CAT B office along with demolition and reinstatement works to a classic, 1950s style building.

Client

Higher Education Institute: Science Building
 

Location

Cambridgeshire

University office fit out
CAT A fit out
Suspended ceiling - design and installation

Phase 1: Science Building fit-out and refurbishment

 

The second part of this multi-facility project for a prestigious, Higher Education Institute based in Cambridge included the refurbishment of the 7th floor of the campus's Science Building. This floor was fully refurbished by SEC Interiors - working in partnership with VolkerFitzpatrick Ltd - to house the Department of Science and Technologies various teaching faculties.

 

SEC's works on the 7th floor of this building included the dismantling and strip out of existing materials and walls where specified. New suspended ceilings were then installed and finished with an exposed bulkhead detail, creating an industrialised aesthetic texture. This exposed bulkead showcases the newly installed HVAC (heating, ventilation and air conditioning) systems, which can be seen through the various Ecophon acoustic panels which were installed to finish off the ceiling. 

 

Further works included partitioning installation utilising a glazed system with integrated electric blinds; a new kitchen tea-point for staff members, and the installation of new cubicles and vanity points, including all necessary decoration. 

 

The completion of the Science Building brings Phase 1 of our works to a finish. Phase 2 of the project is set to begin in May 2018 and will last a total of 60 weeks on-site. 

 

Take a look at the rest of the works involved in Phase 1, including the fit-out of a university lecture room, administrative offices, co-working space, and an optometry lab - based across multiple campus facilities in Cambridge city centre.

 

 

Interested to see what other workplaces we have transformed? View our case studies...

University office fit out
University Science Building refurbishment and fit out
Staff kitchen tea point
Do you need a similar solution? Get in touch. We always aim to respond within 1 hour

Please read our Privacy Notice and Cookie Policy to find out how we will process and use your data.

Teachers offices - fit out and refurbishment works
CAT A educational fit out
HVAC design and installation

Before you go...take a look at some of our other interiors projects