Axalta Coating Systems (UK) Limited - Training Centre & Office Fit Out

Click here to download the Axalta Coating Systems (UK) Ltd PDF case study

Project Brief

Complete fit out of new 2,106 square metre Academy including offices and training facilities.

 

Client Background

Axalta Coating Systems (UK) Limited, originally DuPont Performance Coating; specialises in the production of liquid and powder coatings globally.

Client

Axalta Coating Systems (UK) Ltd
 

Location

Welwyn Garden City
 

Project Summary

The project involved the fit-out of the client's new offices and training facilities prior to the move to their new premises...

Meet and greet - reception area fit-out
Office meet and greet area - refurbishment and fit-out
Custom office artwork - design and installation

Complete fit-out of new 2,106 square metre academy including offices

 

Competitive design and build process, acting as a principle contractor and managing client's specialist installation contractors.

 

The office fit-out project carried out at Axalta Coating Systems (UK) Ltd included a 140 metre squared break-out area, multiple training rooms and administrative offices to accommodate all liquid coating businesses.

 

The extensive project involved the construction of two mezzanine floors above the meet and greet area and in the plant area to house AC units.

 

An innovative, operable wall was supplied and installed in order to divide the two meeting rooms along with suspended ceilings needed to comply with building regulations and partitioning needed to create various spaces.

 

Continued below...

Office operable wall feature

"It was a pleasure to work with SEC Interiors. We are very pleased with the final result which SEC Interiors helped to deliver on time and within budget"

 

Michael McInnes

Technical Manager

Office reception fit-out
Staff breakout space fit-out

Breakout spaces, welfare rooms and WCs

 

New flooring was supplied and installed in numerous rooms including the break-out room, the meet and greet area, the training rooms and offices and the male and female changing rooms and WC's.

 

Three new tea-points were created in the meet and greet area and in the offices on the first and ground floor and equipped with units from Howden's, Greenwich Range.

 

Other project works included electrical installations such as small power, lighting, audio-visual and mechanical installations comprising air conditioning, ventilation and heating.

 

The WCs were fitted out with cubicles and vanity units.

 

New window apertures were created along with decorations and furnishing throughout.